Gas Supply (Amendment) Regulations 2017 [CLICK]
Please [CLICK] the above link for new information.
Thursday, 18 May 2017
Gas Supply (Amendment) Act 2016 [Act A1515]
Gas Supply (Amendment) Act 2016 [Act A1515] [CLICK]
Please [CLICK] the above link for new information.
Please [CLICK] the above link for new information.
Tuesday, 16 May 2017
DOSH- Registration Form for Gas Contractor
Registration Form for Gas Contractor Competent Firm [CLICK]
Please [CLICK] above for information.
Please [CLICK] above for information.
DOSH- Guidelines for Gas Contractor Competent Firm
Guidelines for Gas Contractor Competent Firm
Please [CLICK] above for information.
Please [CLICK] above for information.
GAS CONTRACTOR
DOSH- Gas Contractor
Section 29A of the Factory and Machinery Act 1967 ; stipulate that no person shall manufacture, fabricate, test, install, maintain, dismantle or repair any machinery which is prescribed unless a written authority has been issued by the chief inspector.
Regulation 5(1) of the Petroleum Safety Measures (Transportation of Petroleum by Pipeline), Regulation 1985; stipulate that no person shall install or caused to be installed any pipeline unless he or his authorized representative has obtained a written permission from the approving authority.
Section 29A of the Factory and Machinery Act 1967 ; stipulate that no person shall manufacture, fabricate, test, install, maintain, dismantle or repair any machinery which is prescribed unless a written authority has been issued by the chief inspector.
Regulation 5(1) of the Petroleum Safety Measures (Transportation of Petroleum by Pipeline), Regulation 1985; stipulate that no person shall install or caused to be installed any pipeline unless he or his authorized representative has obtained a written permission from the approving authority.
Tuesday, 6 January 2015
Tuesday, 21 January 2014
Introduction To Unfired Pressure Vessels
Introduction To Unfired Pressure
Vessels
Under the Factories and
Machinery Act 1967, each unfired pressure vessel must have a valid certificate
of fitness (CF) before it can be operated. For this purpose, approval for the
design of the unfired pressure vessel has to be obtained in advance from the
Department of Occupational Safety and Health (DOSH) before it fabricated,
installed or used.
Application for approval
of the design may be made by the manufacturing company, installer, supplier or
owner of the unfired pressure vessel. Local manufacturers of unfired pressure
vessels must register as a manufacturer with the department.
The following are several
examples of unfired pressure vessels that require design approval:
- Air container
- Sterilizer
- LPG storage tank
- Heat Exchanger
- Pressure vessels at the petrochemical plants
etc
For further enquiries,
please contact the On Duty Officer
Unfired Pressure Vessel
Unit,
Industrial Safety
Division,
Department of Occupational
Safety and Health,
Level 3, Block D3, Complex
D,
Federal Government
Administrative Centre
62530 Putrajaya
Tel: 603-8886 5342
Fax: 603-8889 2349
Subscribe to:
Posts (Atom)